Here is a pic of the 2nd floor of the workshop. Jonah likes to run around the temporary brace in the middle.

More of the main floor framing is complete:

Standing in the great room, looking towards the master suite:

Future home of our bathtub to be enclosed in a sun room:

Future home of the french doors in our master bedroom:

Since we have a lot of family stuff this Easter weekend, I haven't done any work on the house. I have been spending some time designing the sliding door for the shop and making a material list so I can get started on it.
No comments:
Post a Comment