Monday, May 26, 2008

Under roof. Rough-ins started.

The roof is on, and now everything inside can finally dry out. We also had the concrete porch poured, along with a small patio outside of the basement, and a small pad for the future heat pump and the footings for the future deck.



The sun room has been installed and the siding has started to go up. This weekend I stained the outside of the sun room to match our siding and touched up the charcoal colored trim. I'm glad I'm not afraid of heights, because the peak of this roof is waaaay up there.

View of the trees from the sun room which is where our air tub will sit.

All of the rough plumbing is complete and passed inspection. The in-wall portion of the radiant floor heat is complete, and the AC ducting is underway. It's nice to see progress, but it makes me sad to see all the cuts and holes in the meticulous framing job. I'll get over it.